This property in Windsor had existing piles, having
been built on an old pond.
When a new extension was planned we opted for installing
more piles of a lesser load.
This enabled us to use a smaller diameter pile and
smaller hammer, thus reducing vibration disruption to
the homeowner and neighbours.
|
|
The rig was small enough to pass through the garden
gate, again minimising inconvenience.
Piles attained a set (satisfactory resistance) at 7m
into the hoggin that had been used to line the water
feature.
We went on to provide a piled slab ready for the builder
to construct the superstructure.
|