This domestic property
had shallow foundations and a leaking drain had washed
away the load-bearing strata. The foundations had to
be extended onto undisturbed ground. Sections of foundations
were tackled in 1.0 metre portions. First they were
excavated, then concrete was poured and allowed to shrink
before being dry packed. |
|
|